|
 |
 |
ProjectsJI

Booklet of the company SEC Biomass (2009) (PDF: 2,1 Ì)
Booklet of the company SEC Biomass: experience in Joint Implementation projects (PDF: 364k)
Handbook on Joint Implementation projects development in Ukraine (in Ukrainian) (PDF: 4.3 M)
Amendment and Suplement to the Handbook on Joint Implementation projects development in Ukraine (PDF: 25k)


PIN and PDD «Landfill methane capture and utilisation at Mariupol landfills, Ukraine»


PDD «Landfill methane capture and flaring at Yalta and Alushta landfills, Ukraine»


PDD “Landfill gas capture and utilization at Chernihiv MSW landfill”


Ñooperation in JI projects development in frame of Kyoto Protocol for potential projects in the field of using biomass (biomass residue, sunflower seed husk, landfill gas, biogas from livestock waste and energy crops ).


"Preparation of Joint Implementation projects in frame of Kyoto protocol"
The Invitation to develop energy-saving JI projects for enterprices of Ukraine and NIS countries through mechanism of Kyoto protocol is aviable in section "ProjectsJI" (at russian-languaged part of site)


PIN for JI Project “Landfill gas capture and utilization at Dnipropetrovs’k MSW landfill, Ukraine”, in cooperation with EVA. Waiting for LoE from Ukrainian Government.


Project idea notes development (PIN) for Landfill methane capture and utilisation at landfills of Ukraine


Identification of 10 new JI projects for Japan JI program. In cooperation with Shimizu Corporation.


PIN for JI Project “Implementation of heat (steam) production with using of biomass waste burning steam boiler at “Uniplit”, Ivano-Frankivsk region, Ukraine”, in cooperation with Shimizu Corporation, Japan.


Development of portfolio from 10 JI projects for German JI program, in cooperation with German Energy Agency, DENA.


PIN for JI Project “Landfill gas collection and utilization for heat (power) production in Belaya Therkov' landfill, Ukraine”, in cooperation with Shimizu Corporation, Japan.


PIN for JI Project “Improvement of degassing system and utilization of Coal Mine methane for heat and power production at Tchaikino Mine, Ukraine”, in cooperation with Shimizu Corporation, Japan.


Feasibility study of Methane Gas Utilization Project at Bortnichi Waste Water Treatment Plant in Kiev, in cooperation with Shimizu Corporation, Japan.


Feasibility study of Poltava Landfill Gas Utilization Project, in cooperation with Shimizu Corporation, Japan.


Feasibility study of Holodna Balka Coal Mine Gas Project, in cooperation with Shimizu Corporation, Japan.


Identification of 10 new JI projects on landfill gas collection and utilization. As subcontractor of Decon - Energie Consult Ingenieurgesellschaft.


Feasibility study of the biogas plant erection for agriculture waste utilization


“Rehabilitation of the District Heating System of Crimea" project proposed by Leasing Enterprise "Krymteplocomunenergo” (passed both PIN and PDD phases, waiting LoA)


“Heat and Power Production on Stripped Casing-head Gas at Boryslav” (passed both PIN and PDD phases, waiting LoA)


“Utilization of sunflower husks for steam and power production at the oil extraction plant OJSC ‘Kirovogradoliya” (passed both PIN and PDD phases, waiting LoA)


PIN for JI Project “- Improvement of wastewater treatment system and biogas utilization for heat and power production at Lugansk WWTP, Lugansk, Ukraine”, in cooperation with Shimizu Corporation, Japan.


PIN for JI Project “- Improvement of wastewater treatment system and biogas utilization for heat and power production at Kharkov WWTP, Kharkov, Ukraine”, in cooperation with Shimizu Corporation, Japan.


Feasibility study for Slavutich wood fired DH project. In cooperation with Sumitomo Corporation. Waiting LoE of Ukrainian Government.


PIN for JI project “Coal mine methane capture and utilization at Bazhanov mine, Donetsk Oblast”. Prepared for National Joint Stock Company “Coal of Ukraine”. Waiting for LoE from Ukrainian Government.


PIN for JI project “Coal mine methane capture and utilization at Krasnolimanskaya mine, Donetsk Region”. Prepared for National Joint Stock Company “Coal of Ukraine”. Waiting for LoE from Ukrainian Government.


PIN for JI project “Coal mine methane capture and utilization at Kirov mine, Donetsk Oblast”. Prepared for National Joint Stock Company “Coal of Ukraine”. Waiting for LoE from Ukrainian Government.


“Methane Capture at the Odessa Municipal Solid Waste Landfill” (ERUPT-5, passed both PIN and PDD phases, refused).


“District Heating System Rehabilitation of Chernigiv Region” (ERUPT-4, passed both PIN and PDD phases, waiting LoA)


Feasibility study for Surgut landfill gas project, Russia. In cooperation with Shikoku Electric Power Co., Inc. (YONDEN). Waiting LoE of Russian Government.


Feasibility study for Lugansk landfill gas project. In cooperation with Shimizu Corporation. Waiting LoE of Ukrainian Government.
|
 |
|
 |